Battery Placement

J-Park Simulator: 

Energy Systems Scenario

? This feature is mainly the extension of the Jurong island electrical network model with the use case of additional solar generator and some batteries included.

The first model inside will choose which type of battery is the most suitable for the selected solar generator added and it will run the OPF simulation with the new generator added.

The final step will be locating the selected battery with specific amount and locations to cover the power losses identified by this OPF simulation.

T/hour MT/year % of Singapore's 2014 GHG Emissions
Actual CO2 Emission:
Design (Max) CO2 Emission:
BatteriesOilNatural Gas
Number and Type of Generators